Skip to product information
1 of 9

AiSeekSmartHomeLife

Smart Pro Series Energy Monitoring Plug 15A, Compatible with Alexa and Google Home, Smart Outlet Time Schedule with APP Remote Control, 2.4GHz Wi-Fi Only, ETL FCC Listed 2Pack

Smart Pro Series Energy Monitoring Plug 15A, Compatible with Alexa and Google Home, Smart Outlet Time Schedule with APP Remote Control, 2.4GHz Wi-Fi Only, ETL FCC Listed 2Pack

Regular price $26.99 USD
Regular price Sale price $26.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • 【Energy Monitoring】:Precise energy tracking, no more bill worries! The AISEEK Pro Series Energy Monitoring Plug gives you real-time insights into your connected devices’ power consumption, cutting unnecessary costs and taking the stress out of electricity bills.
  • 【Flexible Scheduling & Timer】: Effortlessly reduce energy usage with automatic device shutdown after a set time. For example Chrismas Tree, TV, Lamp, Fan, Humidifier,Blenders, Lightbulbs
  • 【Smart Scheduling for Your Grow Lights】:The aiseek smart socket frees you from manually timing your devices. For home grow lights, just set a daily schedule with fixed on/off periods. Its powerful function keeps your plants healthy and thriving.
  • 【Easy set up and use】:2.4GHz Wi-Fi connection required. Plug In, Open the SmartLife app, Follow the simple instructions and enjoy. SmartLife app reqiured
  • 【Smart Voice Control】:Works seamlessly with your home smart speakers. Just speak your needs aloud, and they’ll come to life instantly. The upgrade for your smart living experience ! Note: Only compatible with Alexa and Google Assistant.

Overview

  • Operation Mode : ON-OFF
  • Current Rating : 15 Amps
  • Operating Voltage : 120 Volts
  • Contact Type : Normally Closed
  • Connector Type : Plug In
  • Brand : AiSeek
  • Material : Polycarbonate
  • Item dimensions L x W x H : 1.4 x 0.8 x 2 inches
  • Specification Met : ETL, FCC
  • Control Method : App, Push Button, Voice
View full details

Customers are saying

4.7 ★ (127 reviews) · Verified Buyer
  • ⭐⭐⭐⭐⭐
    The sofa looks amazing in my living room. The fabric feels high quality and it’s more comfortable than I expected. Definitely worth the price.

    James R.

    ⭐⭐⭐⭐⭐
    Very sturdy and easy to assemble. The wood finish looks natural and fits perfectly with my other furniture.

    Emily K.

    ⭐⭐⭐⭐☆
    Solid frame and no noise at all when sleeping. Took a bit of time to assemble but overall very satisfied.

    Michael T.

    ⭐⭐⭐⭐⭐
    Super comfortable. I’ve been sleeping much better since I got this. It’s firm but still soft enough.

    Sarah L.

  • ⭐⭐⭐⭐⭐
    Simple design and gives off a nice warm light. Perfect for evening atmosphere.

    Daniel W.

    ⭐⭐⭐⭐⭐
    The table and chairs are very well made. Looks even better in person and feels durable.

    Olivia M.

    ⭐⭐⭐⭐⭐
    Comfortable and stylish. I use it daily and it hasn’t shown any signs of wear.

    Chris J.

    ⭐⭐⭐⭐☆
    Spacious and practical. Took some effort to build but worth it.

    Brian K.

  • ⭐⭐⭐⭐⭐
    Plenty of storage space and looks clean. Helped organize my room a lot.

    Anna P.

    ⭐⭐⭐⭐⭐
    Compact but functional. The drawer slides smoothly and feels solid.

    David S.

    ⭐⭐⭐⭐☆
    Bright and modern. Installation was easy and it lights up the whole room nicely.

    Jessica H.

    ⭐⭐⭐⭐⭐
    Soft and comfortable underfoot. The color matches the pictures well.

    Ashley W.

Frequently Asked Questions

Orders are typically processed within 3–5 business days. Delivery usually takes 3–12 business days depending on your location.

Yes, we offer a 30-day return policy. Items must be unused, in original condition, and include original packaging.

Once your order has been shipped, you will receive a tracking number via email.

Please inspect your order upon arrival and contact us immediately if there is any issue. We will review the case and make it right.

Orders cannot be canceled once they have been processed. If you contact us before processing, cancellation may be possible.