Skip to product information
1 of 8

Vesgantti

Vesgantti 143.7" Boneless Couch for Living Room, 6 Seater Modular Sectional Sofa with Ottoman & Deep Seat, Convertible Chenille Oversized Cloud Couches, No Assembly Required, Dark Grey

Vesgantti 143.7" Boneless Couch for Living Room, 6 Seater Modular Sectional Sofa with Ottoman & Deep Seat, Convertible Chenille Oversized Cloud Couches, No Assembly Required, Dark Grey

Regular price $1,649.99 USD
Regular price Sale price $1,649.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Flexible Modular Design: The L-shaped sectional sofa has 4 separate sections. Each module can be easily moved and reassembled into loveseat, L shaped sofa, chaise lounge, sleeper sofa, or oversized family sectional couch to match your lifestyle. The modular design allows you to freely create your ideal layout and adapt to ever-changing spaces. All modular seats have a anti-slip design on the bottom to prevent the sofa from sliding during daily use
  • Spacious & Comfortable: The 114 inch modular sofa features 31.5 inch width and 29.5 inch deep seats, providing ample seating space to lounge for you and your family, especially perfert for heavy people. 9.8 inch wide armrests is an ideal place for placing drinks or laptop. The setional couch can easily transforms any room into a warm and comfortable haven for relaxing, entertaining guests, or enjoying a family movie night
  • Durable and Long-lasting Support: This modern sofa is crafted entirely from high-resilience foam, providing lasting support and ultimate comfort. The foam utilizes quick rebound technology, maintaining its shape after prolonged use while providing a comfortable and stable seat. This full foam couch is perfect for a living room, bedroom, office, apartment, guest rooms, and children's play areas, encouraging children to play on its luxurious surface
  • Premium Chenille Fabric: The modular sectional sofa is made of high-quality chenille fabric, which is soft, pill-resistant and pet-friendly; ensuring long-term durability and making it perfect for daily use. The stylish and solid color design adds a touch of luxury and enhances the beauty of your living space. We have a variety of colors for option to meet different decoration styles (Note: Colors may vary slightly due to lighting or monitor settings)
  • No Assembly Required: No tools or complicated setup are required. Our modular couch is vacuum-packed; just simply unpack, gently pat the sections, and wait 72 hours for fully expand. Ultimate comfort and convenience are at your fingertips. The boneless sofa is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages. If you have any questions or are dissatisfied with our sofa, please feel free to contact us

Overview

  • Brand : Vesgantti
  • Assembly Required : No
  • Seat Depth : 29.5 inches
  • Seat Height : 17.7 Inches
  • Weight Limit : 3850 Pounds
  • Seating Capacity : 7.0
  • Product Dimensions : 112.2"D x 143.7"W x 31.5"H
  • Item Weight : 84 Pounds
  • Type : Sectional
  • Color : Dark Grey
View full details

Customers are saying

4.7 ★ (127 reviews) · Verified Buyer
  • ⭐⭐⭐⭐⭐
    The sofa looks amazing in my living room. The fabric feels high quality and it’s more comfortable than I expected. Definitely worth the price.

    James R.

    ⭐⭐⭐⭐⭐
    Very sturdy and easy to assemble. The wood finish looks natural and fits perfectly with my other furniture.

    Emily K.

    ⭐⭐⭐⭐☆
    Solid frame and no noise at all when sleeping. Took a bit of time to assemble but overall very satisfied.

    Michael T.

    ⭐⭐⭐⭐⭐
    Super comfortable. I’ve been sleeping much better since I got this. It’s firm but still soft enough.

    Sarah L.

  • ⭐⭐⭐⭐⭐
    Simple design and gives off a nice warm light. Perfect for evening atmosphere.

    Daniel W.

    ⭐⭐⭐⭐⭐
    The table and chairs are very well made. Looks even better in person and feels durable.

    Olivia M.

    ⭐⭐⭐⭐⭐
    Comfortable and stylish. I use it daily and it hasn’t shown any signs of wear.

    Chris J.

    ⭐⭐⭐⭐☆
    Spacious and practical. Took some effort to build but worth it.

    Brian K.

  • ⭐⭐⭐⭐⭐
    Plenty of storage space and looks clean. Helped organize my room a lot.

    Anna P.

    ⭐⭐⭐⭐⭐
    Compact but functional. The drawer slides smoothly and feels solid.

    David S.

    ⭐⭐⭐⭐☆
    Bright and modern. Installation was easy and it lights up the whole room nicely.

    Jessica H.

    ⭐⭐⭐⭐⭐
    Soft and comfortable underfoot. The color matches the pictures well.

    Ashley W.

Frequently Asked Questions

Orders are typically processed within 3–5 business days. Delivery usually takes 3–12 business days depending on your location.

Yes, we offer a 30-day return policy. Items must be unused, in original condition, and include original packaging.

Once your order has been shipped, you will receive a tracking number via email.

Please inspect your order upon arrival and contact us immediately if there is any issue. We will review the case and make it right.

Orders cannot be canceled once they have been processed. If you contact us before processing, cancellation may be possible.