Skip to product information
1 of 9

Vesgantti

Vesgantti Twin XL Mattress, 6 Inch Gel Memory Foam Mattress for Cool Night & Pressure Relief, Medium Plush Feel with Motion Isolating,Breathable Removable Cover

Vesgantti Twin XL Mattress, 6 Inch Gel Memory Foam Mattress for Cool Night & Pressure Relief, Medium Plush Feel with Motion Isolating,Breathable Removable Cover

Regular price $134.98 USD
Regular price Sale price $134.98 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • 【Cooling & Breathable】 Designed with a 2.5 cm gel memory foam layer and breathable knitted cover, this twin XL mattress regulates temperature, keeping you cool and comfortable all night.
  • 【Pressure Relief & Spine Support】 The memory foam conforms to your body curves, helping to relieve pressure points on shoulders, hips, and legs while maintaining healthy spinal alignment.
  • 【High-Density Durable Foam】 Built with 13 cm high-density supportive foam, this 6-inch mattress provides long-lasting durability, stability, and strong support for restful sleep.
  • 【Motion Isolation for Couples】 Minimize sleep disturbance with excellent motion isolation—ideal for sharing a bed, so you can enjoy deep, undisturbed sleep.
  • 【Easy Setup & Convenient Delivery】 Mattress arrives in a compact box. Simply unbox, unroll, and allow it to expand—ready to use in 24–72 hours. Perfect for bedrooms, guest rooms, and apartments.

Overview

  • Brand : Vesgantti
  • Size : Twin XL
  • Product Dimensions : 80"L x 38"W x 6"Th
  • Item Weight : 27.5 Pounds
  • Item Firmness Description : Medium
  • Top Style : Tight Top
  • Fill Material : Gel Memory Foam
  • Special Feature : Breathable
  • Color : White
  • Model Name : CAN0USM-JJD305BA6TXLWMO-99
View full details

Customers are saying

4.7 ★ (127 reviews) · Verified Buyer
  • ⭐⭐⭐⭐⭐
    The sofa looks amazing in my living room. The fabric feels high quality and it’s more comfortable than I expected. Definitely worth the price.

    James R.

    ⭐⭐⭐⭐⭐
    Very sturdy and easy to assemble. The wood finish looks natural and fits perfectly with my other furniture.

    Emily K.

    ⭐⭐⭐⭐☆
    Solid frame and no noise at all when sleeping. Took a bit of time to assemble but overall very satisfied.

    Michael T.

    ⭐⭐⭐⭐⭐
    Super comfortable. I’ve been sleeping much better since I got this. It’s firm but still soft enough.

    Sarah L.

  • ⭐⭐⭐⭐⭐
    Simple design and gives off a nice warm light. Perfect for evening atmosphere.

    Daniel W.

    ⭐⭐⭐⭐⭐
    The table and chairs are very well made. Looks even better in person and feels durable.

    Olivia M.

    ⭐⭐⭐⭐⭐
    Comfortable and stylish. I use it daily and it hasn’t shown any signs of wear.

    Chris J.

    ⭐⭐⭐⭐☆
    Spacious and practical. Took some effort to build but worth it.

    Brian K.

  • ⭐⭐⭐⭐⭐
    Plenty of storage space and looks clean. Helped organize my room a lot.

    Anna P.

    ⭐⭐⭐⭐⭐
    Compact but functional. The drawer slides smoothly and feels solid.

    David S.

    ⭐⭐⭐⭐☆
    Bright and modern. Installation was easy and it lights up the whole room nicely.

    Jessica H.

    ⭐⭐⭐⭐⭐
    Soft and comfortable underfoot. The color matches the pictures well.

    Ashley W.

Frequently Asked Questions

Orders are typically processed within 3–5 business days. Delivery usually takes 3–12 business days depending on your location.

Yes, we offer a 30-day return policy. Items must be unused, in original condition, and include original packaging.

Once your order has been shipped, you will receive a tracking number via email.

Please inspect your order upon arrival and contact us immediately if there is any issue. We will review the case and make it right.

Orders cannot be canceled once they have been processed. If you contact us before processing, cancellation may be possible.