Skip to product information
1 of 7

Vesgantti

Vesgantti Cal King Mattress, 10 Inch Gel Memory Foam Mattress Cal King Size with Comfort Foam for Pressure Relief & Cool Sleep & Body Support, Made in USA, Medium Feel Bed in a Box, Grey

Vesgantti Cal King Mattress, 10 Inch Gel Memory Foam Mattress Cal King Size with Comfort Foam for Pressure Relief & Cool Sleep & Body Support, Made in USA, Medium Feel Bed in a Box, Grey

Regular price $389.99 USD
Regular price Sale price $389.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • SLEEP SYSTEM: We combine breathable cooling fabric, contouring Gel memory foam, and support base foam to deliver the most restful and healthier sleep you’ll ever experience
  • PERFECT SUPPORT: Whether you're a side sleeper, back sleeper, stomach sleeper, it can perfect support for any position, this memory foam mattress features the optimal level of firmness to perfectly balance your body pressure
  • REMOVABLE COVER: The bottom of the mattress cover is equipped with a smooth zipper for quick removal, making it easy to clean and maintain the cleanliness and hygiene of the sleeping surface
  • SAFE MATERIAL: Our mattresses are made in USA, with safety and durability at the core of our design, CertiPUR-US Certified & Endorsed by ICA, you can use it with confidence
  • MATTRESS IN A BOX:Vesgantti mattress is compressed rolled, and you can easily move it and set it up in your room. It will inflate right after unpacking, but it will be snooze ready in 24-48 hours

Overview

  • Brand : Vesgantti
  • Size : California King
  • Product Dimensions : 84"L x 72"W x 10"Th
  • Item Weight : 66 Pounds
  • Item Firmness Description : Medium
  • Top Style : gel_top
  • Fill Material : Memory Foam
  • Special Feature : Vacuums
  • Color : Grey
  • UPC : 840452625686
View full details

Customers are saying

4.7 ★ (127 reviews) · Verified Buyer
  • ⭐⭐⭐⭐⭐
    The sofa looks amazing in my living room. The fabric feels high quality and it’s more comfortable than I expected. Definitely worth the price.

    James R.

    ⭐⭐⭐⭐⭐
    Very sturdy and easy to assemble. The wood finish looks natural and fits perfectly with my other furniture.

    Emily K.

    ⭐⭐⭐⭐☆
    Solid frame and no noise at all when sleeping. Took a bit of time to assemble but overall very satisfied.

    Michael T.

    ⭐⭐⭐⭐⭐
    Super comfortable. I’ve been sleeping much better since I got this. It’s firm but still soft enough.

    Sarah L.

  • ⭐⭐⭐⭐⭐
    Simple design and gives off a nice warm light. Perfect for evening atmosphere.

    Daniel W.

    ⭐⭐⭐⭐⭐
    The table and chairs are very well made. Looks even better in person and feels durable.

    Olivia M.

    ⭐⭐⭐⭐⭐
    Comfortable and stylish. I use it daily and it hasn’t shown any signs of wear.

    Chris J.

    ⭐⭐⭐⭐☆
    Spacious and practical. Took some effort to build but worth it.

    Brian K.

  • ⭐⭐⭐⭐⭐
    Plenty of storage space and looks clean. Helped organize my room a lot.

    Anna P.

    ⭐⭐⭐⭐⭐
    Compact but functional. The drawer slides smoothly and feels solid.

    David S.

    ⭐⭐⭐⭐☆
    Bright and modern. Installation was easy and it lights up the whole room nicely.

    Jessica H.

    ⭐⭐⭐⭐⭐
    Soft and comfortable underfoot. The color matches the pictures well.

    Ashley W.

Frequently Asked Questions

Orders are typically processed within 3–5 business days. Delivery usually takes 3–12 business days depending on your location.

Yes, we offer a 30-day return policy. Items must be unused, in original condition, and include original packaging.

Once your order has been shipped, you will receive a tracking number via email.

Please inspect your order upon arrival and contact us immediately if there is any issue. We will review the case and make it right.

Orders cannot be canceled once they have been processed. If you contact us before processing, cancellation may be possible.