Skip to product information
1 of 8

Vesgantti

Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch with Ottoman Deep Seat Corduroy Cloud Sofa, 9 Seater Large Sectional Couches for Living Room, Bedroom and Apartment, Black | Sink-in Comfort, Height Adjustable, Easy Rearrangement, Extra-dee...

Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch with Ottoman Deep Seat Corduroy Cloud Sofa, 9 Seater Large Sectional Couches for Living Room, Bedroom and Apartment, Black | Sink-in Comfort, Height Adjustable, Easy Rearrangement, Extra-dee...

Regular price $2,249.99 USD
Regular price Sale price $2,249.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Eight adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 169"W x 101"D x 35.5"H and seating for 6+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 6 seater sectional sofa will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 5 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Seat Depth : 26 inches
  • Weight Limit : 2250 Pounds
  • Seating Capacity : 9.0
  • Product Dimensions : 101"D x 169"W x 35.5"H
  • Item Weight : 35 Kilograms
  • Type : Sectional
  • Color : Corduroy - Black
  • Style : Modern
View full details

Customers are saying

4.7 ★ (127 reviews) · Verified Buyer
  • ⭐⭐⭐⭐⭐
    The sofa looks amazing in my living room. The fabric feels high quality and it’s more comfortable than I expected. Definitely worth the price.

    James R.

    ⭐⭐⭐⭐⭐
    Very sturdy and easy to assemble. The wood finish looks natural and fits perfectly with my other furniture.

    Emily K.

    ⭐⭐⭐⭐☆
    Solid frame and no noise at all when sleeping. Took a bit of time to assemble but overall very satisfied.

    Michael T.

    ⭐⭐⭐⭐⭐
    Super comfortable. I’ve been sleeping much better since I got this. It’s firm but still soft enough.

    Sarah L.

  • ⭐⭐⭐⭐⭐
    Simple design and gives off a nice warm light. Perfect for evening atmosphere.

    Daniel W.

    ⭐⭐⭐⭐⭐
    The table and chairs are very well made. Looks even better in person and feels durable.

    Olivia M.

    ⭐⭐⭐⭐⭐
    Comfortable and stylish. I use it daily and it hasn’t shown any signs of wear.

    Chris J.

    ⭐⭐⭐⭐☆
    Spacious and practical. Took some effort to build but worth it.

    Brian K.

  • ⭐⭐⭐⭐⭐
    Plenty of storage space and looks clean. Helped organize my room a lot.

    Anna P.

    ⭐⭐⭐⭐⭐
    Compact but functional. The drawer slides smoothly and feels solid.

    David S.

    ⭐⭐⭐⭐☆
    Bright and modern. Installation was easy and it lights up the whole room nicely.

    Jessica H.

    ⭐⭐⭐⭐⭐
    Soft and comfortable underfoot. The color matches the pictures well.

    Ashley W.

Frequently Asked Questions

Orders are typically processed within 3–5 business days. Delivery usually takes 3–12 business days depending on your location.

Yes, we offer a 30-day return policy. Items must be unused, in original condition, and include original packaging.

Once your order has been shipped, you will receive a tracking number via email.

Please inspect your order upon arrival and contact us immediately if there is any issue. We will review the case and make it right.

Orders cannot be canceled once they have been processed. If you contact us before processing, cancellation may be possible.